A structured process. A traceable result.

Every project follows a defined sequence, from requirements to handover, with assumptions and decisions recorded along the way.

01Delivery timeline
  1. We analyze the project goals, site data, client requirements and existing documentation.

    Activities

    • Kick-off and scope clarification
    • Review of existing documents and data
    • Identification of applicable requirements

    Client inputs

    • Project goals and brief
    • Site data and existing drawings
    • Client and operator requirements

    Outputs

    • Agreed scope summary
    • Initial list of missing data
    • Open questions register
02Quality control

Checked before it is issued.

  • QC-01

    Verification of input data and assumptions

  • QC-02

    Checked calculations and consistency across schematics, drawings and reports

  • QC-03

    Verification of the edition and applicability of relevant standards

  • QC-04

    Version control and retention of source documents

  • QC-05

    Clear identification of open items requiring client or operator confirmation

  • QC-06

    Checklists, reference checks and a recorded review cycle

03Technical deliverables

The package depends on project type, stage and client requirements. Select an entry in the register to see its purpose and contents.

Ref.DocumentRev
  • DBR-001Design basis report—
  • CAL-100Technical calculations and sizing sheets—
  • DWG-200Electrical schematics, layouts and details—
  • SPC-300Technical specifications and material lists—
  • REV-400Review report, comment register and open items—
  • SRC-500Source files and final versions—

DBR-001

Design basis report

Purpose

Fixes the criteria, input data and confirmed assumptions that every later document relies on.

Contents

  • Project description and scope
  • Design criteria
  • Input data and sources
  • Confirmed and open assumptions